Then more digging
Which resulted in
The side yard was excavated, a retaining wall will be put up and there will be enough parking space for the truck (or boat).
We are continuing with the application of the siding and J and R will be continuing with preparations for installing the deck surface and rehabilitating the area around the back deck which is quite lumpy with sections of concrete, gravel and dirt. Cedar has been primed, ready for installation of the deck roofs and soffits.
Meanwhile
A bit of weather
A bit of foliage
The back garden is beginning to look respectable.
I have been walking up and down hills and the journey has become easier and easier. Today I am walking way down hill to try a yoga class down at the very local gym. I have a seven day pass and will try out the various classes. Hopefully I will make it back up the hill (a big one) without having to resort to a phone call for a ride up.
No comments:
Post a Comment