We will continue on with the main bathroom.
We replaced the bathtub and surround with tile and had a glass shower installed.
New mirrors and a pedestal to complete the update.
These are the changes and improvements we did make.
This was a small dining area. We have installed mega fluorescents and a new built in bookcase. This is designated as my sewing area and I have my tables set up here and my sewing machine.
This is a view of the former living room. I still have the gas fireplace and more built in shelves were made here and a built in spot for my TV.
This is my specially built shelving unit that has sliding baskets which hold my fabrics, yarns and works in progress. There is space on the wall for my quilt cabinet which is still in Lethbridge.
The former kitchen area has reverted to a laundry room again and we have added a laundry sink and upgraded the work surface so that we have a large peninsula on one end.
We have more pictures but you can get an idea of the scope of the project. If any one is interested we can post the details of the changed in the utility room, i.e. furnace, water heater, vacuums. Ha! Ha!
No comments:
Post a Comment