Everything seems to be in sync now, materials are in place and there is crashing and banging on both sides of the house.
This is for anyone who is going to thwart our progress. We have four of them in the back yard which should be sufficient to deal with any city officials, inspectors or environmentalists. Nice thought, but they are the holes for the footings for the back patio.
This morning
This afternoon
Goodbye roof and walls in the master bedroom. The bedroom extension will go out as far as the first posts and the rest will be a covered deck with a new roofline extending out from the house.
Notice the tarp underneath the deck, that is all there is between the outside and the bedroom we are sleeping in. Well maybe a sheet of drywall!
Really impressed with the speed at which progress is being made, in spite of the size of the rocks being discovered! The tarpaulin bedroom wall is also a fantastic feature, so hope the air temperature remains high whilst this is in being.